Bribery for giving assistance in public contracts

A senior engineer was asked by a contractor to manipulate tender requirements in favour of his company in the bidding process.
Cover
Image
Bribery for giving assistance in public contracts
Media Feed Source ID
cases_072_cover_en
fade-up
container

A senior engineer of a public body was assigned to supervise the construction work of the organisation's new headquarters.  In the process of calling tenders for curtain walling works, a contractor and a close associate of the senior engineer indicated immense interest in the project.

Just before an official invitation for tendering was issued, the contractor offered to secure a highly sought-after golf club membership for the senior engineer to exchange for his assistance in winning the tender.  He requested the senior engineer to manipulate tender requirements to suit his company so that he could obtain the contract for the job.  In fact, the contractor charged a much higher rate than the other construction companies and the technical processes for constructing the curtain walling were not cost-efficient.

Case Analysis

The senior engineer might violate the Rules of Conduct of the Hong Kong Institution of Engineers if he abused his official authority to manipulate tender requirements in exchange for an advantage in the form of a golf club membership. He failed to fulfil his obligation to protect the interests of his employer and clients as the contractor might not provide the best service to his organisation, not to mention the excessive construction fee charged.

If the senior engineer had not obtained prior permission from his employer to accept the advantage, he might contravene Section 5 of the Prevention of Bribery Ordinance (POBO), which prohibits a public servant from accepting illegal advantages for giving assistance in securing contracts from the public body. And the contractor, the offeror of advantages for the same purpose, could also be liable to prosecution under Section 5 of POBO.

All Trades/ Industries
Off
migration_resource_id
cases_072

Unreasonable exercise of discretion in project oversight

A senior engineer oversaw a large private housing project. An acquainted contractor asked him to approve extra funds for the project and promised a luxurious overseas trip in return.
Cover
Image
Unreasonable exercise of discretion in project oversight
Media Feed Source ID
cases_071_cover_en
fade-up
container

A senior engineer of an engineering consultant firm recently undertook to oversee a large private housing project.  Owing to frequent contact, he got along famously with a contractor who was around his age and shared his interest in golfing.

On one occasion, the contractor treated the senior engineer to a lavish meal in the Country Club and then revealed his hidden agenda.  He said that the funds for the housing project were quite short and he wished to have more allowances for contingencies.  As the senior engineer could approve claims for additional costs, the contractor tried persuading him to exercise his discretion and add $5,000,000 to the project.  As a token of thanks, the contractor promised to treat the engineer to a luxurious overseas golf trip.

Case Analysis

The exercise of discretion in approving claims should be based on an objective assessment of the project's financial requirements.  To comply with the Rules of Conduct of the Hong Kong Institution of Engineers, the senior engineer should avoid his professional judgement being clouded by the offer of advantages.

The senior engineer was the agent of the consultant firm (the principal) as he oversaw the housing project.  Without the principal's consent, he should not receive an advantage - free golf trip – when dealing with the principal's affairs.  The offering of the free golf trip by the contractor as an inducement for senior engineer to misuse his authority in approving extra funds for to the project would contravene Section 9 the Prevention of Bribery Ordinance (POBO). The senior engineer who accepted the offer would also contravene the law.

All Trades/ Industries
Off
migration_resource_id
cases_071

Leaking tender information

An engineering graduate was offered a big ‘laisee’ by an acquainted sub-contractor who lured him into leaking confidential tender information.
Cover
Image
Leaking tender information
Media Feed Source ID
cases_069_cover_en
fade-up
container

An engineering graduate joined a construction company as an assistant engineer and was responsible for collecting tenders for specialist services.  He came to know a sub-contractor who was particularly on good terms with him as they were both e-sports lovers.

When time came for a tender to be made for a fire-proofing job, the sub-contractor invited the assistant engineer out to a sumptuous dinner over which he suggested a deal.  The assistant engineer was suggested to go through the tenders secretly and inform the sub-contractor about the lowest bid by texting a code to him. The sub-contractor would then beat that price and get his bid in just before the closing time.  In return, the sub-contractor promised to give the assistant engineer a big "laisee" in the coming Lunar New Year.  To win the young fellow over, the sub-contractor said that someone would get the project any way and he was as good as anyone else.

Case Analysis

Corruption will inflate project costs and impair fair competition.  The quality of work would also be in question if the sub-contractor was not chosen by an objective assessment of its competence and capability.

If the assistant engineer leaked the tender information to the sub-contractor, he would breach the Rules of Conduct of the Hong Kong Institution of Engineers, which prohibited engineers from disclosing confidential information and require them to act in the best interest of the employers.

He might also commit a corruption offence under Section 9 of the Prevention of Bribery Ordinance (POBO) if he accepted an advantage as a reward for leaking the confidential tender information to the sub-contractor.

Although the “laisee” might be given in the Lunar New Year, the assistant engineer could not excuse himself by saying that the acceptance was a customary practice during festive seasons as that would not be accepted as a defence under the POBO.

All Trades/ Industries
Off
migration_resource_id
cases_069

Leaking confidential information on potential projects

A senior engineer of a construction consulting firm attempted to make money by selling restricted tender information to interested contractors through a middleman.
Cover
Image
Leaking confidential information on potential projects
Media Feed Source ID
cases_068_cover_en
fade-up
container

A senior engineer of a construction consulting firm, who had obtained the information of a large scale private housing development project through participating in its planning work, attempted to make money by selling the restricted information.

The senior engineer sought his brother's help to carry out the plot.  Before formal invitations for tenders were made public, the senior engineer's brother approached a middleman and asked him to look for a contractor who would be interested in the project.  He said he had restricted information to offer which could assist the tenderer to obtain the contract.  In return, he asked for 10% of the contract price as a reward and promised to share part of the profits with the middleman.

Case Analysis

The senior engineer might breach the Rules of Conduct of the Hong Kong Institution of Engineers, which require an engineer to safeguard confidential information in relation to his employer and to refrain from receiving any advantage for disclosing such information or making use of it for personal gain.

Being an employee of his company, the senior engineer might also breach Section 9 of the Prevention of Bribery Ordinance if he received an advantage to leak confidential information.  The offeror of such advantage would also breach the same law.

Although the advantage was solicited by the senior engineer's brother, the senior engineer himself could still be liable to the charge of a corruption offence as the advantage was to be received on his behalf.

All Trades/ Industries
Off
migration_resource_id
cases_068

Defrauding job payments by false invoices

An engineer conspired with a sub-contractor to deceive payments of jobs which were not carried out by the sub-contractor.
Cover
Image
Defrauding job payments by false invoices
Media Feed Source ID
cases_067_cover_en
fade-up
container

Using a number of false invoices, a company's lift maintenance engineer conspired with two maintenance supervisors and a sub-contractor to defraud his company by claiming that certain jobs were carried out by the sub-contractor whereas the jobs were actually done by the maintenance engineer's subordinates.  The offences came to light when one of the company’s workers who carried out the jobs suspected irregularities and reported to the ICAC.

Case Analysis

Other than committing a deception offence, the maintenance engineer breaches the Rules of Conduct of the Hong Kong Institution of Engineers, which require an engineer to treat his colleagues and co-workers fairly and to avoid abusing his authority.  Misusing his supervisory position for private gain, the maintenance engineer breaches the law and undermines the financial interest of his company.

Implementing proper controls on contracting procedures, carrying out frequent random supervisory checks and conducting regular communication with contractors and staff can help detect early symptoms of irregularities and prevent such malpractices from happening.  Encouraging staff to report malpractices to senior management or the compliance officer through proper channels of complaints will also be effective in stopping unscrupulous staff from committing a crime or malpractice.

All Trades/ Industries
Off
migration_resource_id
cases_067

Soliciting bribes in granting project approval

A government chief engineer solicited $400,000 from a project manager of a land development company for approving a company's car park development project.
Cover
Image
Soliciting bribes in granting project approval
Media Feed Source ID
cases_066_cover_en
fade-up
container

A government chief engineer took advantage of his office to solicit $400,000 from a project manager of a land development company as a reward for assisting the latter to obtain green light for the company's carpark development project.

Subsequent to the first application of the project being turned down by the relevant government department, the chief engineer asked for the advantage from the company. Frustrated at being asked to pay bribes to secure the project, the project manager reported the case to the ICAC.

Case Analysis

As a government employee, the chief engineer was not permitted to accept advantage in connection with his work. In soliciting illegal advantage from the land development company, he had violated Section 4 of the Prevention of Bribery Ordinance (POBO).

The chief engineer's plot failed before he could do anything to secure the project, but he could not escape from legal sanctions. Under Section 11 of the POBO, if it could be proved that an advantage was given to the acceptor as a reward for favours done to the offeror, the following should not be considered a defence: (a) “he did not actually have the power so to do”, (b) “he accepted the advantage without intending so to do” or (c) “he did not in fact so do.”

Business operators or employees who come into frequent contact with government employees have to be particularly careful when managing their relationship with them as they are governed by stringent laws and regulations, restricting their acceptance of advantages in their public and private capacities. The offering of advantages to government officers may also constitute a violation of the POBO.

All Trades/ Industries
Off
migration_resource_id
cases_066

Offering bribes for contract constitutes an offence

An air-conditioning equipment supplier attempted to induce an engineer to award a contract to a designated sub-contractor and promised to reward the engineer with cash.
Cover
Image
Offering bribes for contract constitutes an offence
Media Feed Source ID
cases_064_cover_en
fade-up
container

An air-conditioning equipment supplier provided spare parts to an engineering company for an air-conditioning project of a large exhibition centre. As some of the parts supplied broke down due to manufacturing fault, the supplier engaged a sub-contractor to carry out repairing work at its own expenses. The work, however, was done unsatisfactorily. The engineering company subsequently reallocated the work to its own contractor and assigned an engineer to supervise the work. The supplier thus approached the engineer in a bid to get the job back to his sub-contractor and promised to reward the engineer by a sum of cash.

The engineer refused the offer and reported the matter to the ICAC.

Case Analysis

Case Analysis

The supplier offered an advantage (i.e. cash) to the engineer, who was an employee (i.e. agent) of the engineering company (i.e. principal), as an inducement or reward for showing favour in relation to his principal’s business by awarding the contract back to the supplier’s sub-contractor.  The supplier contravened Section 9(2) of the Prevention of Bribery Ordinance (Cap.201) (POBO).  Had the engineer accepted the bribe without the permission of his principal, he would have contravened Section 9(1) of the POBO. 

 

Case in Perspective

The use of bribery to obtain contracts will inflate the operation costs of the bidder and cause unfairness to other bidders who observe the principle of fair play.  The services procured may also fall short of standard and affect the overall quality of the job because no supplier can go on absorbing corrupt payments and still give the quality you want.  It is crucial for management to provide integrity training so that staff at all levels understand the anti-corruption laws and stay vigilant to the risks of corruption when performing their duties. 

The positive action of the engineer is a good illustration of the proper action to take when one is being offered a bribe or has discovered malpractices.  Staff members should refuse any bribes and promptly report any suspected malpractices or illegal activities to law enforcement agencies including the ICAC and/or the management.  Companies should establish a clear and confidential whistle-blowing mechanism.

All Trades/ Industries
Off
migration_resource_id
cases_064
Show Only in Sector/Industry
False
Sector / Industry Priority display

Substandard work - piling

A works supervisor discovered that the length of the constructed piles did not match with the concrete delivery records for the piles. He suspected that some of the piles might have been shortened…
Cover
Image
Substandard work - piling
Media Feed Source ID
cases_061_cover_en
fade-up
container

In January 2001, Lee & Wong Holdings Ltd (LW) awarded a $1,000 million contract to a main contractor for constructing four 40-storey residential blocks, a commercial complex and a car park.   The main contractor then sub-contracted  the  piling  work  to  another  company.    The  latter  in  turn awarded the work to Saar Piling Company Ltd (Saar) by simply deducting 15% of his original successful bid.  LW also appointed a consultant firm Joe & Partners (JP) to oversee the construction work.   The project was scheduled to be completed in twenty months and five months were allowed for the piling works.

JP deployed an engineer as the Project Manager (PM) to oversee the project but he was not required to be resident on site.   Occasionally, he would go to the site for meetings but did not carry out site inspections himself. Routine site inspection was left to an Assistant Inspector of Works (AIoW) and a Works Supervisor (WS) who were resident site staff appointed by JP. However, the AIoW had very limited experience in piling work.

As there were only two supervisory staff on site responsible for overseeing the whole piling works, the AIoW and the WS found it difficult to check every detail during the work process.  They could only rely on the records of Saar and sign the completion forms taking the face value without checking.

Due to unexpected difficulty encountered during the placing of reinforcement casings, LAM, Director of Saar, found that the piling work was behind schedule and a one-month delay was anticipated.   Saar, being a small sub-contracting company, found it difficult to bear possible substantial liquidated damage (LD) of $800,000 per day as stipulated under the main contract.

LAM then discussed the making of shortened piles with the foreman and site agent of the main contractor, who were always away from work and thus failed to monitor the work progress.  They thought that the specifications stipulated in the contract were conservative and shortened piles should cause no severe harm to the completed buildings resting on top of the piles.   They believed that the buildings would not be structurally affected.

LAM instructed his workers not to excavate the pile bores as deep as the proposed founding levels.   Instead, after the length of the reinforcement casings had been checked by the supervisory staff of JP, LAM asked his workers to cut the casings during night time when the consultant site supervisory staff were off duty.   LAM then manipulated a measuring tape by removing parts of its central portion so that it gave a reading longer than the actual measurement.   When the supervisory staff of JP measured the pile bore depth using the manipulated measuring tape provided and re-examined the reinforcement casing, they were not able to detect that the piles had been shortened.

One day, the WS of JP discovered that the length of the constructed piles did not match with the concrete delivery records for the piles.   He suspected that some of the piles might have been shortened.   He immediately approached LAM for an explanation for the irregularities discovered and the proposals for remedial actions.

LAM, after discussion with the foreman and site agent, went to the WS’s office to hand him an envelope containing $300,000 and plead him to turn a blind eye to the substandard piling works.   The WS immediately refused LAM’s request.

The WS immediately  reported LAM’s  offering of bribes to the ICAC. LAM, the site foreman and site agent of the main contractor were arrested and convicted of conspiracy to offer an advantage to the WS as a reward for turning a blind eye on substandard piling work.

Questions

  1. Why were LAM, the foreman and site agent convicted of corruption offences? What actions should you take when being offered bribes?
  2. How devastating would the damages be if a construction professional accepts advantages for turning a blind eye to substandard works? What are the consequences of such behaviour?
  3. What is the importance of site supervision at a construction site?
Case Analysis

Section 9 of the Prevention of Bribery  Ordinance (POBO)

LAM conspired with the foreman and site agent to offer the Works Supervisor $300,000 for his turning a blind eye to the substandard piling work was an offence under Section 9 of the POBO.   This section states that:

  • It is an offence for an agent (normally an employee) to solicit or accept an advantage without the permission of his principal (normally the employer) when conducting his principal’s affairs or business; and
  • The person who offers the advantage also commits an offence.

Report Corruption

The positive action of the Work Supervisor was a good illustration of the proper action to take when one was being offered a bribe: refuse the bribe immediately and report the matter to the ICAC.

Consequences of Corruption

Turning a blind eye to substandard works would result in building defects, causing the company extra costs to rectify the problem.  Worse still, such hidden faults in construction works would be hazardous to public safety.

Construction professionals should bear in mind the implications of substandard works to public safety, as their responsibilities to his employer and the profession should at all times be governed by the overriding interest of the general public.

In similar court cases previously, the judge commented that the defendants “place in jeopardy not only the structure and those using it but also the reputation of Hong Kong.   The potential consequences of their actions may quite fairly be described as disastrous.   The conduct of these Accused casts a shadow over the entire construction industry…”

Corruption could also bring devastating damage to one’s career and reputation. Construction professionals need to live by a high standard of integrity so as to resist the corruption temptations facing them in the workplace.

Site Supervision

The allocation of adequate resources to site supervision is crucial to ensuring the quality of works.   Site supervisory staff are sometimes inadequate, both in number and experience, and may therefore not be able to monitor the work of the contractor effectively nor promptly detect any fraudulent acts. Employers/consultants should deploy sufficient on site supervisory staff with appropriate training and experience.

The deployment of only technical staff on site is inadequate and professional input is important especially at critical construction stages.

Infrequent site visits by professional staff is not uncommon in the construction industry.   In fact, regular supervisory check is crucial in ensuring that the work complied with the required standard.   Supervisory staff should use their own measuring tapes in checking the pile depth.   In addition, the role of independent internal technical audit should also be strengthened so as to guard against any possible malpractice.

All Trades/ Industries
Off
migration_resource_id
cases_061

Turning a blind eye

Lennon, a foreman of a landfill site, was struggling if he should turn a blind eye and let his friend to collect any valuable materials from the landfill, which was prohibited by the management…
Cover
Image
Turning a blind eye
Media Feed Source ID
cases_057_cover_en
fade-up
container

Lennon was a foreman working in the Hong Kong Harbour Engineering Company Limited which was a contractor carrying out the sanitary landfill and associated works at the Sai Kung Landfill.

One of the duties of Lennon was to evict gleaners from the landfill site as it was laid down very clearly that no salvage of any material within the site was permitted. There was a large sign displayed at the entrance of the site in both Chinese and English which could cause no misunderstanding.

Lennon had an old friend Gary who was unfortunately laid off a few months ago.  After much effort, Gary finally started a recycling business.  He approached Lennon one day asking to be allowed to send his men around to see what could be salvaged.  He promised that it would be done very discreetly and unobtrusively.  There were various arguments between the two. Gary doubted if Lennon would have anything to lose because he was merely lending a helping hand by turning a blind eye.  Gary stressed that it was all for a good cause, that environmental protection was the duty of every global citizen and that no real victims or suffering parties were involved.  Gary continued to persuade Lennon that the rules could always be bent a little bit.  The important thing was not to disturb the operation of the landfill.

Lennon thought to himself, “Should I help my old friend out?  He was an unfortunate guy.  Must I adhere to the rules laid down by the firm?  Gary was quite right.  What have I got to lose?  Why can’t I have a say in things as minor as these?  Maybe at the end of the day, I can still say I have evicted Gary’s people but not after they have had a chance to glean through the stuff a bit.  These practice was common in construction sites.”

Case Analysis

Lennon was facing an ethical dilemma that might put his personal values such as compassion, responsibility and honesty to challenge. On one hand, his turning a blind eye to allow Gary to collect materials from the landfill can help Gary overcome financial difficulties; on the other hand, he has to discharge his duties according to the work instructions.  In handling the situation, Lennon should identify the relevant facts and take stock of all stakeholders concerned. The following factors should be taken into consideration when identifying viable alternatives and choosing the best course of action for himself:

  1. Does his decision violate any professional, industry specific, or company code of conduct?

  2. Is his decision against the law?

  3. Does it correspond with his self-values such as honesty?

  4. Can he disclose the decision to others openly and honestly without misgivings?

The ETHICS PLUS ethical decision making model might be helpful for him in solving the dilemma.

All Trades/ Industries
Off
migration_resource_id
cases_057
Show Only in Sector/Industry
False

Expedition of payment

A proprietor of a subcontractor offered advantages to the inspector of works of the government department as a reward for expediting the checking of works orders.
Cover
Image
Expedition of payment
Media Feed Source ID
cases_056_cover_en
fade-up
container

A Government Department (the Department) awarded a slope maintenance  contract  to  Chongs  Construction  Company  Ltd,  which  then sub-contracted the works to JKW Subcontracting Company (JKW), of which CHEUNG was the proprietor.

From time to time, the Department issued to the contractor works orders (WOs) describing the work required, location and estimated value of the work. Upon completion of work, an Inspector of Works (IoW) of the Department would physically inspect and verify whether the work done was in compliance with the required standard.   Based on the recommendation made by the IoW, the project engineer would approve payment to the contractor by signing on the WO concerned.   He was not required to physically inspect every piece of work completed as over a hundred WOs were issued every month.

When the engineer signed on the WO, the contractor could apply for payment by submitting the WO to the Accounting Section of the Department. A contractor could only apply for payment on completion of work as certified on the WO.

In conjunction with the payment process, the Quantity Surveying Section of the Department counter-checked the work of the contractor.   However, the Quantity Surveyors of the Section could only randomly check 10% of the WOs issued.   Both the project engineer and the quantity surveyors might therefore not be able to detect abuse in relation to the WOs.

YAU was an IoW of the Department responsible for overseeing the works carried out by JKW.   In March 2000, CHEUNG approached YAU and urged YAU to expedite the checking of WOs. Hence, CHEUNG could receive payment earlier.   In return, CHEUNG offered YAU a part-time job with $8,000 a month.

Between April 2000 and December 2001, YAU accepted a part-time job from CHEUNG as a reward for expediting the checking of WOs issued to CHEUNG.   On many occasions, YAU certified work completion on the WOs though the work concerned had not even commenced.

YAU and CHEUNG were later arrested by the ICAC and were found guilty of offences under Section 4 of the Prevention of Bribery Ordinance (POBO).   Both YAU and CHEUNG were sentenced to imprisonment.

Questions

  1. How did YAU and CHEUNG violate Section 4 of the Prevention of Bribery Ordinance?
  1. Besides the offer of a part-time job, what else can be classified as an“advantage”?
  1. What should be watched out for in site supervision to prevent malpractice?
Case Analysis

Section 4 of the Prevention of Bribery  Ordinance

YAU and CHEUNG were convicted of offering/accepting an employment as a reward for abusing YAU’s official position as a public servant, contrary to Section 4 of the POBO.   Under this section, it is an offence for:

  • a public  servant  to  solicit  or  accept  any  advantage  offered  as  an inducement to or reward for any action or inaction in connection with the performance of his official duty; and
  • any person who offers such an advantage.

Advantage

As stipulated in the POBO, an offer of employment or contract is defined as an advantage.   Attention should also be drawn to the fact that loans from contractors are also classified as advantages. Such dealings are often precursors to more serious corrupt arrangements and should be avoided.

Site Supervision

Site supervision is crucial in different stages of work.   Reliance on a single individual should be avoided.   Senior officers should conduct spot checks, closely monitor the quality and progress of work and keep thorough and accurate records.   The role of independent auditing should also be strengthened to provide a means to detect possible malpractice at an early stage.   In addition, corruption prevention awareness amongst all tiers of supervisory staff should be raised.

All Trades/ Industries
Off
migration_resource_id
cases_056
Survey Questions
1. In which country or region are you currently located?
Hong Kong
Chinese Mainland
Other (please specify)
2. What type of organisation do you represent?
Listed company
Large private company
SME / start-up
NGO / non-profit
Public organisation
Chamber / trade association
Other (please specify)
3. What is the size of your organisation?
1 - 49 employees
50-99 employees
100 - 199 employees
200 or more employees
4. What is your staff level or position?
Executive / senior management
Middle management
Professional
Supervisory level
Frontline/Technical Staff
Other (please specify)

Thank you for your feedback.